Phillips Petroleum Company Australia Pty Ltd (now ConocoPhillips Australia Pty Ltd) were given approval by both the NT and Commonwealth environmental ministers in 1998 for the construction and operation of a proposed 3 Million Tonnes Per Annum (MTP A) LNG facility at Wickham Point, in Middle Arm of Darwin Harbour. Post construction inspections were carried out by MEB in January and March 2006. Sites of particular
interest were stormwater drains, stormwater drain end points, stormwater pits, sediment basins and discharge points, disturbed tidal areas and landscaped areas. As this report is based on the post construction inspection only, discussion on mosquito species is limited to the major potential pest and vector species. For further information on mosquito species mentioned in this report readers should refer to the Wickham Point Baseline Biting Insect Report (Warchot and Whelan 2004).
interest were stormwater drains, stormwater drain end points, stormwater pits, sediment basins and discharge points, disturbed tidal areas and landscaped areas. As this report is based on the post construction inspection only, discussion on mosquito species is limited to the major potential pest and vector species. For further information on mosquito species mentioned in this report readers should refer to the Wickham Point Baseline Biting Insect Report (Warchot and Whelan 2004).
Publisher
Medical Entomology Branch.
File(s)![Thumbnail Image]()
Loading...
Name
00534 Darwin LNG plant post construction inspection for mosquito breeding sites.pdf
Size
19.4 MB
Format
Adobe PDF
Checksum
(MD5):e9bebdc37f252a958fd217490003838c
Date Issued
2006
Type
Report
Permanent link to this record
Owning collection