Please use this identifier to cite or link to this item: https://hdl.handle.net/10137/8027
Title: Darwin LNG plant post construction inspection for mosquito breeding sites
Authors: Warchot A
Whelan PI
Corporate Author: Northern Territory Medical Entomology Branch
Publisher: Medical Entomology Branch.
Abstract: Phillips Petroleum Company Australia Pty Ltd (now ConocoPhillips Australia Pty Ltd) were given approval by both the NT and Commonwealth environmental ministers in 1998 for the construction and operation of a proposed 3 Million Tonnes Per Annum (MTP A) LNG facility at Wickham Point, in Middle Arm of Darwin Harbour. Post construction inspections were carried out by MEB in January and March 2006. Sites of particular interest were stormwater drains, stormwater drain end points, stormwater pits, sediment basins and discharge points, disturbed tidal areas and landscaped areas. As this report is based on the post construction inspection only, discussion on mosquito species is limited to the major potential pest and vector species. For further information on mosquito species mentioned in this report readers should refer to the Wickham Point Baseline Biting Insect Report (Warchot and Whelan 2004).
Publication Date: 2006
Type: Report
URI: https://hdl.handle.net/10137/8027
Appears in Collections:(c) Historical Collection

Files in This Item:
File Description SizeFormat  
00534 Darwin LNG plant post construction inspection for mosquito breeding sites.pdf19.87 MBAdobe PDFView/Open


Items in ePublications are protected by copyright, with all rights reserved, unless otherwise indicated.

Google Media

Google ScholarTM

Who's citing